Resumé
Energinet Eltransmission A/S har offentliggjort tildelingen af „220 kV Submarine cable systems for the SLF02-project“. Anslået værdi: 24 mio. EUR. Offentliggjorte vindere: LS Cable & System Ltd.
- Estimeret værdi
- Over 20 mio. DKK
- Ordregivertype
- Forsyningssektor
- Indkøbsområde
- Foreslåede emner
Udledt automatisk af kildeteksten. Emner er forslag og ikke gennemgået. Kontrollér altid originalen.
Beskrivelse fra kilden
The Contracting Authority wants to purchase the complete functional supply of a total of approximately 20 km 220 kV three-core submarine cable (installed as 3 separate, parallel cable systems) containing an optical fibre cable, including all labour, equipment and materials required for design, fabrication and factory testing, transport of cable and accessories to a port in Zealand, Denmark, installation of transition joints and hang offs and completion and commissioning as a part of a three new 220 kV cable system connecting Vordingborg Nord (VONØ) substation to Eskilstrup (ESK) and Nørre Radsted (NRA) substations. For further details concerning the purchase, reference is made to the tender documents.
Dette er et begrænset kildeudsnit. Se fuld beskrivelse, dokumenter, rettelser og aktuelle betingelser i originalen.
Åbn det oprindelige udbudKendte frister
Frist er ikke oplyst i udsnittet.
Fristerne er ikke knyttet til bestemte delaftaler i dette kildeudsnit. En fremtidig frist er ikke en samlet vurdering af hele procedurens status.
Oplyste værdier
- 24 mio. EUREstimeret · procedure
Beløb gengives hver for sig og lægges ikke sammen på tværs af valuta, type eller omfang.
Offentliggjorte vindernavne
LS Cable & System Ltd
Navnene etablerer ikke alene leverandørens forbindelse til en bestemt delaftale eller et bestemt beløb.